Manufacturing - Layer Pairs
Rule category: Manufacturing
Rule classification: Unary
Summary
This rule checks to ensure that the used drill-pairs match the currently defined drill-pairs. The used drill-pairs are determined from the vias and pads found in the board. The permissable drill-pairs are defined in the Drill-Pair Manager dialog.
Constraints
- Enforce layer pairs settings - specifies whether the check is made or not.
How Duplicate Rule Contentions are Resolved
All rules are resolved by the priority setting. The system goes through the rules from highest to lowest priority and picks the first one whose scope expression matches the object(s) being checked.
Rule Application
Online DRC, Batch DRC, and during interactive routing.