New in Requirements & Systems Portal

Requirements & Systems Portal is under continuous development. This page outlines new features and enhancements made to the application in key updates.

Update - 14 April 2026

  • For requirements that have no assigned V&V activities, you now have the ability to manually define their V&V status. Double-click the requirement's V&V Status cell and select either Verified or Not Verified from the menu that appears.

    The V&V status of requirements that have linked V&V activities is set based on the status of these activities.

    Note that V&V rules no longer affect the V&V status of requirements.

    For more information about requirements verification, refer to the Flow 4: Manual and Rules Verification flow page.

  • When adding an applicable block to a requirement which V&V Status was manually set to Verified, you will now get a warning that the requirement was already verified. Use the warning window to choose either to keep the V&V status of the requirement or reset the status (set it to Not Verified) while adding the block.

    For more information about available requirement fields, refer to the Requirement Fields page.

  • When you copy requirements using the Custom Copy, Connected Copy, or Master-Follower Copy method and some of the requirement being copied have assigned V&V activities, a warning is now shown next to the V&V Status field of the Reuse Requirements window at the Select Fields to Copy & Synchronize stage. 

    In the example shown below, several requirements were selected, and some of them have V&V activities assigned.

    When copying these requirements using Custom Copy, Connected Copy, or Master-Follower Copy, a warning will be shown next to the V&V Status field. 

     

    If all requirements being copied have assigned V&V activities, it will be not possible to select the V&V Status field as a field to be copied.

    For more information about the Custom Copy feature, refer to the Reuse Requirements page.

  • The Create Requirement window has been improved to provide a more straightforward process of creating a requirement. When the window is initially accessed, it is presented in a simple form, with the Identifier and Text fields only. Click the  button at the bottom of the dialog to access other fields, such as Specification, Section, etc.

    The Create Requirement dialog in its simple form.

    The Create Requirement dialog in its advanced form.

     

    For more information about creating requirements, refer to the Creating Requirements page.

  • When you manually create a requirement and select to check it for possible valis (by enabling the Parametrize values option in the Create new requirement window), the process of valifying the requirement is now performed in the background. After clicking the  button in the Create new requirement window, the requirement is now created immediately, without showing further windows related to the valifying process. Once the requirement is valified, you can click the  button in the pop-up that appear at the bottom right of the page for details about the valifying process.

    After creating a requirement with the Parametrize values option enabled, it appears in the list immediately, and a pop-up notifying about the valifying process appears at the bottom right of the page.

    Once the process if finished, another pop-up appears, from which you can access the Calculation Details window.

     

    For more information about valifying requirements, refer to the Valify Requirements page.

  • In the Select Requirements window used to assign requirements to a block (accessed by clicking the  button in the Requirements view of a block in the System Design module), you now have the ability to select columns to be displayed in the window (Columns) and the ability to filter the content of the window based on requirements' Identifier, Text, and Specification.

    For more information about the System Design module, refer to the System Design Module page.

  • To provide consistency with entities related to Verification & Validation, the Methods field has been renamed to V&V Methods in all places of Requirements Portal. Some examples of these places are shown below.

    The V&V Methods column in a specification table in the Requirements module

    The V&V Methods column in a specification's Parents view in the Requirements module

    The V&V Methods column in the list of activities in the Verification & Validation module

     

    For more information about the Verification & Validation Module, refer to the Verification & Validation Module page.

Update - 31 March 2026

Update - 23 March 2026

Update - 3 March 2026

Update - 18 February 2026

Update - 2 February 2026

Update - 22 January 2026

Update - 7 January 2026

Update - 17 December 2025

Update - 24 November 2025

Update - 12 November 2025

Update - 14 October 2025

Update - 30 September 2025

Update - 1 September 2025

Update - 31 July 2025

Update - 9 July 2025

Update - 26 June 2025

Update - 12 June 2025

Update - 27 May 2025

Update - 15 May 2025

Update - 22 April 2025

Update - 20 March 2025

Update - 21 February 2025

If you find an issue, select the text/image and pressCtrl + Enterto send us your feedback.
Feature Availability

The features available to you depend on which Altium solution you have – Altium Develop, an edition of Altium Agile (Agile Teams or Agile Enterprise), or Altium Designer (on active term).

If you don’t see a discussed feature in your software, contact Altium Sales to find out more.

Conteúdo