Engineering Change Order

Modified by Phil Loughhead on Jun 16, 2017

The Engineering Change Order dialog

Summary

This dialog presents the currently generated Engineering Change Order (ECO). An ECO lists all modifications required to implement changes to one or more design documents in order to synchronize those documents.

Perhaps the most important and most often encountered situation for the use of ECOs is when synchronizing the source documents of the captured design and the target PCB implementation of that design. Changes on either side will always need to be pushed to the other side in order to maintain synchronicity, which is where the ECO comes into play. Refer to Design Synchronization for more information. 

Access

ECOs are used to effect design updates in a variety of situations. The dialog is accessed in the following ways:

  • Click the Create Engineering Change Order button in the Differences between dialog.
  • Click the Accept Changes (Create ECO) button in the Annotate dialog when performing annotation on the source schematic documents.

The Schematic and PCB Editors also provide direct synchronization commands. These commands are direct in the sense that the update direction for any differences is fully one way or the other. The Differences between dialog will not appear. Instead, where differences are detected, the Engineering Change Order dialog will be presented loaded with the modifications needed to push the design changes from the schematic to the PCB or vice versa.

The following direct synchronization command is available from within the target PCB document:

  • Design » Import Changes From - this command is used to update the active PCB document with changes made to the source schematic documents of the parent project.

The following direct synchronization command is available from within a source schematic document:

  • Design » Update PCB Document - this command is used to update the indicated PCB document with changes made to the project's source schematic documents.

Options/Controls

The dialog is divided into two main regions: Modifications and Status.

Modifications

This region of the dialog lists all modifications necessary to implement the changes required to bring about synchronization. Modifications are grouped by modification type as listed and enabled on the Project Options - ECO Generation dialog. The entry at this group level reflects the number of modifications of that type. Each specific modification in this region is listed in terms of the following:

  • Enable - this option determines whether or not the modification will be included when the ECO is executed. Click directly on the checkbox to toggle its state between enabled/included (checked) and disabled/excluded (unchecked).
  • Action - the specific action to be carried out. The types of actions are dependent on what type of ECO needs to be done. Choices are: Add, Remove, or Modify.
  • Affected Object - the object affected by the action.
  • Affected Document - the document upon which the action will be carried out.
Multiple modifications can be selected in the list using standard multi-select techniques (Ctrl+click, Shift+click).
If the Mode for a modification type has been set to Ignore Differences in the ECO Generation tab of the Project Options dialog, then any design update that results in the action of this modification type will not be transferred to the Engineering Change Order dialog.

Right-Click Menu

By default, all modifications are enabled for inclusion when the ECO is executed. Enable/disable each modification entry as required, either individually or use the following commands available from the right-click menu to change the enabled state of multiple modifications:

  • Validate Changes -  click to run a validation check on the modifications enabled for inclusion in the ECO. Validation results will appear in the Check column under the Status region of the dialog.
  • Execute Changes - click to execute the ECO. Execution results will appear in the Done column under the Status region of the dialog. Remember, only changes that pass the validation stage will be executed.
  • Create Report - click to generate a report for the modifications contained in the ECO. The report will be loaded into the Report Preview dialog. 
  • Cross Probe - click to cross-probe to target and reference objects that are involved in a modification action on the associated schematic and PCB documents.
  • Expand All - click to expand the view of all modifications in the listing.
  • Contract All - click to contract the view of all modifications in the listing.
You can also expand or contract individual modification groupings using the +/- controls to the left of the entry.
  • Enable All - use to enable all modifications.
  • Disable All - use to disable all modifications.
  • Enable Selected - use to enable all selected modifications.
  • Disable Selected - use to disable all selected modifications.
  • Enable all of same Kind - use to enable all modifications of the same modification type as the currently focused modification.
  • Disable all of same Kind - use to disable all modifications of the same modification type as the currently focused modification.
  • Invert Selection - use to quickly select all modifications not currently selected in the list and deselect those that are.

Status

This region of the dialog presents the following status information for each enabled modification:

  • Check - this field shows the result of running a validation check on the modification. A green tick () means that the proposed change is supported and will be carried out upon execution of the ECO. A red cross () means that the proposed change is invalid and will not be carried out when the ECO is executed.
  • Done - this field shows the result of execution of the modification. A green tick () means that the valid modification executed successfully.
  • Message - if the modification fails the validation stage, an entry will appear in this field (and also in the Messages panel), giving an indication as to why it failed.
You can close out of the dialog at any stage in order to investigate why certain changes are failing and make any design changes necessary.

Additional Controls

The following controls are available at the bottom of the dialog and in the right-click menu:

  • Validate Changes - click to run a validation check on the modifications enabled for inclusion in the ECO. Validation results will appear in the Check column, in the Status region of the dialog.
It is important to validate the proposed modification actions before executing them. This tests the logic of your proposed changes.
  • Execute Changes - click to execute the ECO and effect the valid changes contained therein. Execution results will appear in the Done column, in the Status region of the dialog. Remember, only changes that pass the validation stage will be executed.
  • Report Changes - click to generate a report for the modifications contained in the ECO. The report will be loaded into the Report Preview dialog. 
Keep in mind that the report will list all modification entries regardless of whether they validate and execute successfully.
  • Only Show Errors - check this option to only show Engineering Change Order errors. Validated changes will not be displayed. Showing only the list of errors will enable you to quickly review and make necessary changes to your design so that the resulting ECO validates completely.
 
Found an issue with this document? Highlight the area, then use Ctrl+Enter to report it.

お問合せ

お近くの営業所にお問合せください。

We're sorry to hear the article wasn't helpful to you.
Could you take a moment to tell us why?
You are reporting an issue with the following selected text
and/or image within the active document:
Altium Designer 無償評価版
Altium Designer 無償評価版
Altium Designerを使用していますか?

弊社の営業担当より詳細情報をご案内しますので、アルティウムジャパン までお問い合わせください。.
Copyright © 2019 Altium Limited

評価版ライセンスが必要な理由を下記から選択してください。

弊社の営業担当より詳細情報をご案内しますので、アルティウムジャパン までお問い合わせください。.
Copyright © 2019 Altium Limited

その場合、評価版ライセンスは不要です。

ボタンをクリックして、最新のAltium Designerインストーラをダウンロードしてください。

Altium Designerインストーラをダウンロードする

弊社の営業担当より詳細情報をご案内しますので、アルティウムジャパン までお問い合わせください。.
Copyright © 2019 Altium Limited

Altium Designerの新規ライセンスのお見積もりをご希望の場合、下記のフォームに入力してください。

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。

Altium Designerサブスクリプションをご利用中の場合、評価版ライセンスは不要です。

お客様がAltium Designerサブスクリプションの有効なメンバーではない場合、下記のフォームに入力して無償評価版をダウンロードしてください。

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。

Altium Designerを評価する理由を下記から選択してください。

弊社の営業担当より詳細情報をご案内しますので、アルティウムジャパン までお問い合わせください。.
Copyright © 2019 Altium Limited

無償評価版を使用するには、下記のフォームに入力してください。

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。

Great News!

Valid students can get their very own 6-month Altium Designer Student License for FREE! Just fill out the form below to request your Student License today.

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。

その場合、Altium Designerビューワーの無償ライセンス(有効期間6か月)をダウンロードできます。

下記のフォームに入力してライセンスをリクエストしてください。

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。

素晴らしいですね。アルティウムではモノづくりに最適なプログラムを提供しています。

Upverterは、コミュニティ主導型の無償プラットフォームで、お客様のような作り手の要求に合わせて設計されています。

試してみる場合、こちらをクリック してください。

弊社の営業担当より詳細情報をご案内しますので、アルティウムジャパン までお問い合わせください。.
Copyright © 2019 Altium Limited

その場合、Altium Designerビューワーの無償ライセンス(有効期間6か月)をダウンロードできます。

下記のフォームに入力してライセンスをリクエストしてください。

プライバシーポリシーに同意の上、[ダウンロード]をクリックしてください。ご登録いただきましたメールアドレスにメールマガジンが送信されます。メール配信の停止は、メール内の​通知設定​​でお手続きいただけます。