Project Options - Managed OutputJobs

This document is no longer available beyond version 4. Information can now be found here: Project Options - Managed OutputJobs for version 5

Applies to NEXUS Client version: 4

This documentation page references Altium NEXUS/NEXUS Client (part of the deployed NEXUS solution), which has been discontinued. All your PCB design, data management and collaboration needs can now be delivered by Altium Designer and a connected Altium 365 Workspace. Check out the FAQs page for more information.

 The Managed Outputjobs tab of the Project Options dialog
The Managed Outputjobs tab of the Project Options dialog

Summary

This tab of the Project Options dialog allows you to configure a list of output job templates that are available through your connected workspace to be used with the project.

The Managed OutputJobs tab of the Project Options dialog is not included with the Standard Subscription Plan. As such, this functionality will not be available with this level of access to Altium 365.

Access

This is one of multiple tabs available when configuring the options for a project accessed from within the Project Options dialog. To access this dialog:

  • Click Project » Project Options in the Schematic or PCB Editor.
  • Right-click on the Project entry on the Projects panel then click Project Options from the context menu.

Options/Controls

  • Outputjob List - lists all the managed outputjobs in terms of Item Revision, Revision State, Description, and Name.
  • Add - click to open the Select configuration item (Output Jobs) dialog to select the desired outputjob(s).
  • Remove - click to remove the selected output job(s).

Additional Option

  • Set To Installation Defaults - click to set all options to installation defaults.