Custom Revision ID

Now reading version 18.1. For the latest, read: Custom Revision ID for version 21
Applies to Altium Designer versions: 18.0 and 18.1

The Custom Revision ID dialogThe Custom Revision ID dialog

Summary

The Custom Revision ID dialog allows you to manually specify the revision of the target item into which the generated data will be released.

Access

The dialog is accessed in the Configure Vault Release stage (Stage 1) of the Project Releaser (Project » Project Releaser) by selecting Custom in the drop-down menu associated with the Target Revision entry. 

Options/Controls
  • Level 1 ID - use the up/down buttons to select the desired revision ID. You can also enter the desired value in the textbox.
  • Level 0 ID - use the up/down buttons to select the desired revision ID. You can also enter the desired value in the textbox.
The ID of the item's first planned revision can be changed at any point after the Item is created and before data is released into that initial revision (i.e. it is still in the Planned state).
Note

The features available depend on your level of Altium Designer Software Subscription.