WorkspaceManager_Dlg-RevisionIdEditorFormCustom Revision ID_AD

Вы просматриваете версию 18.0. Для самой новой информации, перейдите на страницу WorkspaceManager_Dlg-RevisionIdEditorForm((Custom Revision ID))_AD для версии 21

The Custom Revision ID dialogThe Custom Revision ID dialog

Summary

The Custom Revision ID dialog allows you to manually specify the revision of the target item into which the generated data will be released.

Access

The dialog is accessed in the Configure Vault Release stage (Stage 1) of the Project Releaser (Project » Project Releaser) by selecting Custom in the drop-down menu associated with the Target Revision entry. 

Options/Controls
  • Level 1 ID - use the up/down buttons to select the desired revision ID. You can also enter the desired value in the textbox.
  • Level 0 ID - use the up/down buttons to select the desired revision ID. You can also enter the desired value in the textbox.
The ID of the item's first planned revision can be changed at any point after the Item is created and before data is released into that initial revision (i.e. it is still in the Planned state).
If you find an issue, select the text/image and pressCtrl + Enterto send us your feedback.
Примечание

Доступные функциональные возможности зависят от вашего уровня Подписки на ПО Altium Designer.