WorkspaceManager_Dlg-ChangedDocumentsFormConfirm Save for Modified Documents_AD

您正在阅读的是 18.0. 版本。关于最新版本,请前往 WorkspaceManager_Dlg-ChangedDocumentsForm((Confirm Save for Modified Documents))_AD 阅读 21 版本

 The Confirm Save for Modified Documents dialog The Confirm Save for Modified Documents dialog

Summary

The Confirm Save for Modified Documents dialog allows you to choose which modified documents are to be saved and which are not when closing one or more projects that have design documents with unsaved modifications.

Access

This dialog is accessed in the following ways:

  • When attempting to close an open project that has at least two modified design documents that have not yet been saved.
  • When attempting to close Altium Designer when there are at least two open, modified design documents across multiple projects that have not yet been saved.

Options/Controls

  • Document List - the main area of the dialog lists all open and modified documents for which you need to make a decision about whether or not to save. Documents are grouped by type (e.g., PCB Documents, PCB Projects, Schematic Documents). Each document lists the following:
    • Document Name - the name of the document.
    • Document Path - the path to the local copy of the document that resides in the applicable installation folder.
    • Decision - the decision of whether or not to save the document. By default, the entry will be set to   Save. Use the drop-down to change this to   Don't Save if desired.
  • Save All - click to quickly set the decision for all documents in the list to   Save.
  • Save None - click to quickly set the decision for all documents in the list to   Don't Save.
  • Save Selected - click to quickly set the decision for all currently selected documents in the list to   Save.
Use standard Ctrl+click and Shift+click techniques to select multiple entries. Note that multi-selection only works across documents in the same grouped category

可用的功能取决于您的 Altium Designer 软件订阅级别