VersionControl_Dlg-CommitToVersionControlCommit to Version Control_AD

This document is no longer available beyond version 17.1. Information can now be found here: Commit Changes for version 24

Applies to Altium Designer versions: 15.1, 16.0, 16.1 and 17.0


The Commit to Version Control dialog.

Summary

 The Commit to Version Control dialog allows the designer to commit project files to VCS.

Access

In the Projects panel, right-click on a file that is not version controlled and select Version Control » Commit Whole Project.

Options/Controls

Upper Pane

 This upper pane lists all files in the selected project and lists whether or not they are in VCS. Additional relevent information is also listed, including whether a file is marked for addition or deletion. The designer can select files to commit to version control. The Path column shows the path of each file, the Status column shows the file's current status. This part of the dialog also features a small right-click menu with the following options:

  • Select All - Click to select all files listed in the dialog. Selected files will be added to VCS.
  • Select None - Click to deselect all files listed in the dialog. These files will not be added to VCS.
  • Select Project Documents - Click to select only project documents. Only the selected files will be added to VCS.

Lower Pane

  • Comment - The designer can write comments before committing the files to version control in this text box.

Click OK  to accepted changes and commit selected documents to VCS. Click Cancel to exit the dialog without accepting changes.

 

注記

利用できる機能は、Altium Designer ソフトウェア サブスクリプション のレベルによって異なります。